ETC Australia tackled the challenges of cable identification, confined-space terminations, and complex cable transitions for the Kwinana Battery Energy Storage System. By providing innovative solutions like Nexans inline joints and shear-off lugs, we ensured the project was completed on time with no delays. Discover how our expertise drove seamless project execution.

Client

Alcoa Kwinana

Date

August 2021 - June 2024

Location

Western Australia

The Challenge

During the tender process for the Kwinana Battery Energy Storage System, several complex challenges emerged that required innovative solutions. 

A key issue was identifying numerous unknown cables and determining the most effective methods for terminating them within confined spaces. Additionally, the project demanded expert guidance in selecting the ideal kits to seamlessly join different cable types and facilitate smooth transitions from 3-core to single-core cables where needed. Meeting tight project deadlines added to the urgency, necessitating the precise supply of materials and flawless execution to keep the project on track.

The solution

To address these challenges, our team worked closely with electrical engineers, providing detailed guidance on standard termination techniques designed for confined spaces. We recommended versatile Nexans inline joints, known for their broad range-taking capability, along with all-metal shear-off lugs that accommodate multiple cable sizes and allow seamless joining of copper and aluminum cables. These innovative solutions streamlined the process, ensuring reliable and efficient cable terminations that met the project's technical requirements with precision.

The Outcome

The project was successfully completed on time, with the proposed solutions seamlessly implemented to ensure uninterrupted progress. Our tailored approach and effective collaboration eliminated potential delays, allowing work fronts to proceed smoothly and efficiently.
Portfolio

Related Projects

Perth Train Authority
Partnering with a local transformer supplier, ETC Australia addressed the need for quick access to specialised terminations and bushings. By stocking 11, 22, and 33kV bushings locally, we reduced turnaround times from up to 20 weeks to immediate availability, streamlining projects and building a strong partnership. Learn how we’re supporting fast, efficient solutions.